Work Plan The Work Plan is a key enabler in 3GPP and is about to become a key tool in the planning of TISPAN Release 2.
The left part of the Gantt chart contains the names and attributes of the Work Items, the right part contains a calendar view reflecting the work progress (blue and grey lines apply to foreseen tasks, black lines apply to completed tasks). The indentation of Work Item names reflects the hierarchical level in the tree structure (Features, Building Blocks, and Work Tasks). The Work Plan is maintained in Microsoft Project. For a wider audience, an image is also available in HTML.
Work Plans for 3GPP and ETSI TISPAN are provided by the ETSI support staff prior to Plenary meetings of these two standards groups.
Release Features
To meet market requirements, 3GPP and TISPAN specifications are being enhanced with new features.
|
|
TISPAN is presently examining the mechanism for maintaining its Release 1 specifications, and tracking the IMS dependencies in 3GPP. At the same time TISPAN is writing NGN Release 2 specifications. |
|
|
3GPP
is working on Releases up to release 8 - See links below for details of the time-frames and content.
The list of specifications needed for each 3G and GSM release is listed in the Technical Report mentioned in the table below (Available on-line at
http://www.3gpp.org/specs/releases.htm).
|
|
GSM/EDGE Release
|
3G Release
|
Abbreviated name
|
|
Functional freeze date (indicative only)
|
|
Phase 2+ Release 8
(will be TR 41.101)
|
Release 8
(will be TR 21.101)
|
Rel-8
|
8.x.y
|
|
|
Phase 2+ Release 7
(will be TR 41.101)
|
Release 7
(will be TR 21.101)
|
Rel-7
|
7.x.y
|
September 2005
|
|
Phase 2+ Release 6
(TR 41.101)
|
Release 6
(TR 21.101)
|
Rel-6
|
6.x.y
|
December 2004 - March 2005
|
|
Phase 2+ Release 5
(TR 41.101)
|
Release 5
(TR 21.101)
|
Rel-5
|
5.x.y
|
March - June 2002
|
|
Phase 2+ Release 4
(TR 41.101)
|
Release 4
(TR 21.101)
|
Rel-4
|
4.x.y
|
March 2001
|
|
-
|
Release 2000
|
R00
|
4.x.y
|
see note 1 below
|
|
Phase 2+ Release 2000
|
-
|
9.x.y
|
|
-
|
Release 1999
(TR 21.101)
|
R99
|
3.x.y
|
March 2000
|
|
Phase 2+ Release 1999
(TR 01.01)
|
-
|
8.x.y
|
|
Phase 2+ Release 1998
(TR 01.01)
|
-
|
R98
|
7.x.y
|
early 1999
|
|
Phase 2+ Release 1997
(TR 01.01)
|
-
|
R97
|
6.x.y
|
early 1998
|
|
Phase 2+ Release 1996
(TR 01.01)
|
-
|
R96
|
5.x.y
|
early 1997
|
|
Phase 2
(TR 01.01)
|
-
|
Ph2
|
4.x.y
|
1995
|
|
Phase 1
(TR 01.01)
|
-
|
Ph1
|
3.x.y
|
1992
|